Project Overview
Clare Island Water Reservoir are a crucial part to the water system which supplies water to homes throughout the island. Over time, the structure exhibited signs of weathering, structural wear, and required essential repairs to maintain its integrity. Adrian Queally Ltd (AQL) was engaged to carry out a comprehensive refurbishment to the exterior of the water reservoirs on Clare Island, addressing both external and internal deterioration while applying protective coatings to prolong the structure’s lifespan.

client objectives
Gallery
Scope of works
Surface Preparation Works – All external surfaces were subjected to a high-pressure clean-down to remove contaminants, debris, and surface deterioration. Concrete Repairs to Structural Ring Beam- Structural elements suffering from wear and minor damage were mechanically removed and repaired using high-performance cementitious repair mortars. Crack Injection- All the joints between the wall panels were crack injected to stop the treated water from leaking out of the tank. External Joint Filling- All joints between panels were solid filled and a protective coating was applied over. All roof joints and cracks were address with joint sealing solutions to stop water ingress. Movement Joint and Crack Sealing- All of the roof joints and cracks were solid filled and then a bandage system was applied to allow movement, while stopping any water ingress. Roof Surface Protection- The roof received a flexible, protective coating to resist environmental damage and extend the life of the concrete. External Protective Coating- The walls of the tank received a protective coating which will protect the tank from the harsh elements. Design & Installation of Steel Tension Bands- AQL designed and installed steel tension bands to help prevent any further movement or cracking within the tank