Residential Property, Tipperary

Project Overview

AQL was engaged to apply a protective waterproof coating to the buried concrete elements of a new house in County Tipperary. This system was applied to prevent the concrete from erosion underground and prolong its lifespan.

client objectives

Ensure the longevity and structural integrity of the building. Ensure the system prevents any water ingress/ egress. A concrete protective coating to all buried concrete elements Allow for flexibility and movement

Scope of works

AQL carried out a restoration and protection measures, including: Surface Preparation: High pressure clean to concrete to remove dirt and grime. Waterproofing System- A waterproof concrete protective coating was then applied to the concrete. This coating allows for the concrete to be protected and waterproofed from all the elements it will experience when buried. It is also flexible, which ensures the coating will not crack due to movement.

Challenges

Buried Structure- As the concrete was being buried, the coating had to stand up to erosion or any other attack it may encounter to protect the concrete. Surface Contaminants & Deterioration: The presence of accumulated grime, biofilm, and pollutants on concrete surfaces necessitated thorough mechanical preparation before coatings and repairs could be applied. Structural Movement- Due to the nature of the structure, there is a certain element of movement as the house settles. If a rigid coating was used it would crack, allowing water to enter. For this reason, a flexible coating was used to allow for this movement.

Results

Structural Longevity: The protective coatings significantly enhanced the lifespan of the concrete, ensuring long-term durability.

Conclusion

The successful completion of this waterproofing project highlights AQL’s expertise in waterproofing across all sectors. Through meticulous planning, industry-leading materials, and specialist application techniques, AQL delivered a high-quality, long-lasting solution that ensures the house remains operational, waterproofed and protected for years to come.

Related projects