Project Overview
AQL were engaged to apply a chemical resistant lining and repair the concrete to a sulphuric acid bund in Clara Water Treatment Plant, Offaly. Overtime, the existing coating had broken down due to chemical spills, exposing and damaging the concrete in some areas. AQL specified and installed an application to restore and protect the concrete fail-safe bund for many years to come.

client objectives
Gallery
Scope of works
AQL carried out a restoration and protection measures, including: Surface Preparation: All surfaces within the bund were mechanically prepped, followed by dust and debris removal to allow for a good bonding surface Concrete Repairs- Due to a severe chemical spill, a large hole had formed in the concrete. The area was prepped, rebar treated and a chemical resistant resin solution was used to fix the area. All blowholes or imperfections were also filled using an epoxy filler system. Application of Primer- A quick-curing epoxy primer was applied to the concrete to enhance bonding of the final coatings. Chemical Resistant Coating Application: Chemical resistant coating was applied to specific chemical storage concentrate to protect all concrete surfaces.